TOP
Update: Bridge Maintenance Work Overnight Lane Closures on Southbound Tappan Zee Bridge
Press Release March 21, 2016 No Comments

Update: Bridge Maintenance Work Overnight Lane Closures on Southbound Tappan Zee Bridge

March 21, 2016

Maintenance work on the existing Tappan Zee Bridge will necessitate overnight lane closures from Monday, March 21, to Friday, March 25. Specific lane closure times on the bridge and the New York State Thruway (I-87/I-287) are detailed in the chart below.


LANE CLOSURES NEAR THE TAPPAN ZEE BRIDGE

DATE: CLOSURES BEGIN: CLOSURES END: LOCATION:
Mon., 3/21 10 p.m. – one right lane 5 a.m., Tue., 3/22 Southbound
Tappan Zee Bridge
Tue., 3/22 10 p.m. – one right lane 5 a.m., Wed., 3/23 Southbound
Tappan Zee Bridge
Wed., 3/23 8 p.m. – two left lanes 5 a.m., Thu., 3/24 Southbound Thruway
From exit 12 to exit 11
Wed., 3/23 10 p.m. – one right lane 5 a.m., Thu., 3/24 Southbound
Tappan Zee Bridge
Thu., 3/24 10 p.m. – one right lane 5 a.m., Fri., 3/25 Southbound
Tappan Zee Bridge
Fri., 3/25 10 p.m. – one right lane 5 a.m., Sat., 3/26 Southbound
Tappan Zee Bridge

All lane closures are subject to change due to traffic, weather or emergency situations. Please visit https://www.thruway.ny.gov/travelers/map/ for real-time information regarding traffic conditions.