Tappan Zee Constructors, LLC (TZC) will continue preconstruction activities the week of July 8 in Westchester and Rockland Counties.
Ongoing operations:
- Cleaning and preparation for future construction of the Thruway’s Rockland Bulkhead
- Construction of the temporary Westchester work trestle which includes pile driving operations that will occur between 7 a.m. and 7 p.m.
- Survey inspections on existing bridge
- Rockland environmental monitor installations continue
- Geotechnical land borings
- Mobilization at the Exit 10 staging area
- Support for river-based work from the Rockland shoreline
Lane closures will be in place on the right lane of northbound I-87/I-287 on Monday, Tuesday and Friday from 10 a.m. to 3 p.m. for installation of instrumentation to monitor the existing bridge during construction. Lane closures will also be in place on the southbound right lane of I-87/I-287 Wednesday and Thursday from 10 a.m. to 3 p.m. for the same activity.