TOP
No Work Scheduled July 4—New NY Bridge Celebrates Independence Day
Press Release June 28, 2013 No Comments

No Work Scheduled July 4—New NY Bridge Celebrates Independence Day

June 28, 2013

Tappan Zee Constructors, LLC (TZC) will not work on July 4 in observance of Independence Day.
Preconstruction activities will continue throughout the week; however, TZC will have no lane closures in order to keep traffic moving on the Thruway.
Ongoing operations:

  • Cleaning and preparation for future construction of the Thruway’s Rockland Bulkhead
  • Construction of the temporary Westchester work trestle which includes pile driving operations that will occur weekdays from 7 a.m. to 7 p.m. (except for July 4)
  • Survey inspections on existing bridge
  • Rockland environmental monitor installations continue
  • Geotechnical land borings
  • Mobilization at the Exit 10 staging area
  • Support for river-based work from the Rockland shoreline

Westchester:
Limited geotechnical analysis boring operations continue this week on Thruway property and will not require lane closures as work will be performed behind barriers.  Work may be scheduled between the hours of 7 a.m. and 3:30 p.m.

Rockland:
Limited geotechnical analysis boring operations continue this week on Thruway property and will not require lane closures as work will be performed behind barriers.  Work may be scheduled between the hours of 7 a.m. and 3:30 p.m.